SHL Medical AG Südtor Zug

The construction of the new headquarters of SHL Medical AG marks the start of the transformation of the southern area of the Technology Cluster Zug. The combination of production and offices within one utilisation concept places high demands on the planning. SOLTIC is leading the planning team as general planner.
From Hong Kong to Switzerland
SHL Medical moved its headquarters to Zug a few years ago. The world’s leading provider of injection system solutions is now even closer to its customers and more closely networked in Europe. In addition to Switzerland, SHL has sites in Taiwan, Sweden and the USA.
SHL Medical produces medical auto-injectors. These are pre-filled syringes that allow users to inject themselves with pre-dosed medication independently of medical staff. SHL Medical’s new headquarters and production site is now being built in Zug as part of the “SHL-Südtor” project.
The SHL South Gate is being built on the Tech Cluster Zug AG site. As the first building on the south site, it occupies a strategically important position. SOLTIC takes over the General planning for several sub-projects, BIM management and BIM coordination.
- Basic expansion (SAB standard expansion) on behalf of Tech Cluster Zug AG:
Realisation of the building as a lettable property. The architects Penzel Valier AG use as many sustainable materials as possible for the construction. - Tenant fit-out (BAB fit-out) on behalf of SHL Medical AG:
Interior fit-out of the production, logistics, warehouse and plant equipment areas as well as the operational building technology - MEH-Südtor on behalf of Tech Cluster Zug AG and WWZ AG:
PV system, medium-temperature and low-temperature cooling pipes, transfer stations and e‑charging stations in the underground car park
Speak about us
Speak to us

We look forward to hearing from you.
Danny Riedel
Managing Director
Director