SOLUTIONS
SOLTIC stands for “holistic solutions”. We act as consultants, planners and project managers for our customers. Here you will find an overview of our reference projects in the various service areas and sectors.
1–37 of 37 references
-
SHL Medical AG Südtor Zug
SOLTIC is leading the planning team as general planner for the new headquarters of SHL Medical AG in Zug. -
Basel car park for e‑buses
New construction of the Rank garage for BVB’s e‑bus fleet: SOLTIC plans the workshop, storage and operating equipment. -
New V‑ZUG headquarters
“Zephyr West” — SOLTIC takes over overall management of the planning team for the new V‑ZUG headquarters. -
Master plan for the Emmi plant in Dagmersellen
SOLTIC drew up a master plan that sets out the guidelines for the structural development of the plant. -
CST — low-emission and climate-friendly freight transport
SOLTIC provides project management support for Cargo Sous Terrain, an automated total logistics system for Switzerland. -
Lift planning for the new Stadelhofen railway station — Zurich
SOLTIC is responsible for the design and specification of the lifts and escalators in the SBB project 4th track at Stadelhofen station. -
Study on the use of AGVs
SOLTIC investigated the automation of internal transport for Comet using an automated guided vehicle system (AGV). -
Study on the expansion of storage capacity
SOLTIC has conducted a study on the logistics infrastructure for GEBLOG Med AG Kaltbrunn, which identifies development potential. -
New building materials warehouse and sales outlet HG COMMERCIALE
The new HG COMMERCIALE sales outlet in Inwil is being built under the direction of SOLTIC as general planner. -
New headquarters of Tonet AG
Tonet is supported by SOLTIC in the logistics planning for the construction of the new company headquarters in Däniken. -
Lift planning for the Basel University Library
SOLTIC took on the lift planning as part of a refurbishment of the existing library building from 1962. -
Optimisation of the production of a machine manufacturer
SOLTIC optimised production for a machine manufacturer: Value Stream Mapping + definition of future target processes according to Lean. -
Improving performance and ergonomics in outgoing goods
SOLTIC optimised the dispatch warehouse for a white goods manufacturer and supported the implementation of the project. -
Logistics planning for a new pharmaceutical distribution centre
In this factory & logistics design project, SOLTIC designed intralogistics systems for a highly automated goods distribution centre. -
Further development of SCM and logistics at Energie Wasser Bern
In this project, SOLTIC supported Energie Wasser Bern (ewb) in the conceptualisation of future supply chain management. -
Optimisation of processes in the maintenance workshop of a transport company
In this project, SOLTIC provided support for the workshop and maintenance facilities of a transport company. -
Logistics for a new laboratory building
SOLTIC was responsible for designing the logistics, including a pneumatic tube system for distributing blood samples for a laboratory building. -
Specialist logistics planner for a new pharmaceutical warehouse
SOLTIC took over the logistics planning for a pharmaceutical warehouse across all phases (SIA 31–53) including connection to a WMS. -
Operational logistics for a new research institute
As a logistics expert, SOLTIC ensured efficient laboratory, warehouse and catering logistics. -
Lift planning for a high-rise office building
SOLTIC provided the design + specification for a high-rise building based on simulated passenger flows and lift movements. -
New research and training centre for medicine on the “construction area 07” of the island site
SOLTIC is planning the logistical supply and disposal for the new building of the University of Bern. -
Operational logistics for the new building of the Graubünden University of Applied Sciences Centre, Chur
SOLTIC designed the intralogistics for the Graubünden University of Applied Sciences Centre in Chur. -
Partial automation of intralogistics at Corden Pharma
In this project, SOLTIC aligned the intralogistics (transport and storage) to the increased requirements. -
Endress+Hauser Flow, New Work Infrastructure
For Endress+Hauser Flow, SOLTIC is taking over the project management in the change process for the design of the new office worlds. -
CKW — Operating and depot concept
SOLTIC developed the operating and depot concept for CKW as part of a relocation programme. -
Lift planning for the University of Zurich (UZH)
SOLTIC carried out the lift planning for a new building at the University of Zurich (UZH): Specification + design. -
Operational logistics for the Irchel campus of the University of Zurich
SOLTIC designed the operational logistics for a multifunctional building at the University of Zurich (UZH). -
“Efficient group logistics” for Dr Falk Pharma and Losan Pharma in Eschbach
SOLTIC provided support as logistics planner for the new construction of the fully automated logistics centre of Dr. Falk Pharma and Losan Pharma. -
Logistics planning for Boehringer Ingelheim Pharma in Biberach
SOLTIC supported Boehringer Ingelheim as a logistics planner in a variety of issues relating to site logistics. -
Logistics concept for the Fondation Beyeler Riehen
SOLTIC designed a concept for a central warehouse for event materials and furniture and the organisation of the logistical processes. -
Concept for the expansion of production and customer service logistics
In this factory & logistics design project, SOLTIC prepared a feasibility study for the expansion of a logistics building. -
Logistics planner in the N.I.C.O. project (B. Braun Medical AG, Sempach)
In this project, SOLTIC was responsible for logistics planning across all phases (SIA 31–53) in the life science industry. -
Operational logistics for the new building of the University of Zurich (UZH)
SOLTIC carried out the lift planning for a new building at the University of Zurich (UZH): Specification + design. -
Expansion of a goods handling centre at Pistor
SOLTIC was responsible for the general planning and overall coordination of the extension to the WUZ West goods handling centre. -
BIM management and coordination in a major industrial construction project
Model-based collaboration and coordination: SOLTIC consistently applied the BIM methodology in a major industrial construction project. -
Relocation planning for maintenance workshops
SOLTIC developed a concept for the relocation strategy of maintenance workshops and managed costs and deadlines. -
New solutions for internal transport
SOLTIC has developed flexible and sustainable storage and transport solutions for the Institute for Infectious Diseases.