BIM management and coordination in the vertical factory

Visualisation of a BIM project to illustrate the visual inspection and coordination between the building services and logistics departments

The new Zephyr Ost con­struc­tion project was planned using BIM method­ol­o­gy across all trades. The dig­i­tal plat­form (Dalux Field) was used to trans­fer the mod­el to the real­i­sa­tion phase. SOLTIC was respon­si­ble for the over­ar­ch­ing BIM man­age­ment and the Over­all BIM coor­di­na­tion, includ­ing the dig­i­tal coor­di­na­tion meet­ings (DKS) and mod­el tests.

Speak about us

Speak to us

Portrait Danny Riedel

We look forward to hearing from you.

Dan­ny Riedel
Man­ag­ing Direc­tor
Direc­tor