{"id":7519,"date":"2026-06-08T20:12:49","date_gmt":"2026-06-08T18:12:49","guid":{"rendered":"https:\/\/www.soltic.ch\/?post_type=solutions&#038;p=7519"},"modified":"2026-06-08T20:12:50","modified_gmt":"2026-06-08T18:12:50","slug":"reference-bim-zephyr-east","status":"publish","type":"solutions","link":"https:\/\/www.soltic.ch\/en\/solutions\/referenz-bim-zephyr-ost\/","title":{"rendered":"BIM man\u00adage\u00adment and coor\u00addi\u00adna\u00adtion in the ver\u00adti\u00adcal fac\u00adto\u00adry"},"content":{"rendered":"<p>The new Zephyr Ost con\u00adstruc\u00adtion project was planned using BIM method\u00adol\u00ado\u00adgy across all trades. The dig\u00adi\u00adtal plat\u00adform (Dalux Field) was used to trans\u00adfer the mod\u00adel to the real\u00adi\u00adsa\u00adtion phase. SOLTIC was respon\u00adsi\u00adble for the over\u00adar\u00adch\u00ading BIM man\u00adage\u00adment and the <a href=\"\/en\/skills\/bim-overall-coordination\/\">Over\u00adall BIM coor\u00addi\u00adna\u00adtion<\/a>, includ\u00ading the dig\u00adi\u00adtal coor\u00addi\u00adna\u00adtion meet\u00adings (DKS) and mod\u00adel tests.<\/p>","protected":false},"excerpt":{"rendered":"<p>SOLTIC was respon\u00adsi\u00adble for BIM man\u00adage\u00adment and over\u00adall BIM coor\u00addi\u00adna\u00adtion dur\u00ading the plan\u00adning of the new Zephyr Ost con\u00adstruc\u00adtion project.<\/p>","protected":false},"featured_media":7521,"template":"","meta":{"_acf_changed":true,"wp_typography_post_enhancements_disabled":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":""},"referenzen-tag":[19,16,11],"class_list":["post-7519","solutions","type-solutions","status-publish","has-post-thumbnail","hentry","referenzen-tag-bim-management-koordination","referenzen-tag-generalplanung","referenzen-tag-industrie"],"acf":[],"taxonomy_info":{"referenzen-tag":[{"value":19,"label":"BIM-Management\/-Koordination"},{"value":16,"label":"Generalplanung"},{"value":11,"label":"Industrie"}]},"featured_image_src_large":["https:\/\/www.soltic.ch\/wp-content\/uploads\/2026\/06\/ref-bim-zephyr-ost-v32-1024x683.jpg",1024,683,true],"author_info":[],"comment_info":"","_links":{"self":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/solutions\/7519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/solutions"}],"about":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/types\/solutions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/media\/7521"}],"wp:attachment":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/media?parent=7519"}],"wp:term":[{"taxonomy":"referenzen-tag","embeddable":true,"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/referenzen-tag?post=7519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}