{"id":2642,"date":"2024-09-02T08:14:43","date_gmt":"2024-09-02T06:14:43","guid":{"rendered":"https:\/\/soltic.mainagentur-stage.de\/solutions\/verbesserung-von-leistung-und-ergonomie-im-warenausgang\/"},"modified":"2024-11-30T22:38:31","modified_gmt":"2024-11-30T21:38:31","slug":"reference-optimisation-outgoing-goods","status":"publish","type":"solutions","link":"https:\/\/www.soltic.ch\/en\/solutions\/referenz-optimierung-warenausgang\/","title":{"rendered":"Improv\u00ading per\u00adfor\u00admance and ergonom\u00adics in out\u00adgo\u00ading goods"},"content":{"rendered":"<p>Opti\u00admi\u00adsa\u00adtion of the dis\u00adpatch ware\u00adhouse of a white goods man\u00adu\u00adfac\u00adtur\u00ader. Improve\u00adment of rout\u00ading in order pick\u00ading and dis\u00adpatch prepa\u00adra\u00adtion from the high-bay ware\u00adhouse to the lor\u00adry. Opti\u00admi\u00adsa\u00adtion of pack\u00ading pat\u00adterns and improve\u00adment of work ergonom\u00adics in dis\u00adpatch. Review of the opti\u00admi\u00adsa\u00adtion approach\u00ades by means of a sim\u00adu\u00adla\u00adtion of the entire sys\u00adtem and sup\u00adport dur\u00ading imple\u00admen\u00adta\u00adtion.<\/p>","protected":false},"excerpt":{"rendered":"<p>SOLTIC opti\u00admised the dis\u00adpatch ware\u00adhouse for a white goods man\u00adu\u00adfac\u00adtur\u00ader and sup\u00adport\u00aded the imple\u00admen\u00adta\u00adtion of the project.<\/p>","protected":false},"featured_media":4401,"template":"","meta":{"_acf_changed":true,"wp_typography_post_enhancements_disabled":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":""},"referenzen-tag":[15,4,11],"class_list":["post-2642","solutions","type-solutions","status-publish","has-post-thumbnail","hentry","referenzen-tag-fabrik-logistikdesign","referenzen-tag-fachplanung","referenzen-tag-industrie"],"acf":[],"taxonomy_info":{"referenzen-tag":[{"value":15,"label":"Fabrik- &amp; Logistikdesign"},{"value":4,"label":"Fachplanung"},{"value":11,"label":"Industrie"}]},"featured_image_src_large":["https:\/\/www.soltic.ch\/wp-content\/uploads\/2024\/11\/ref-optimierung-warenausgang-v32-1024x682.png",1024,682,true],"author_info":[],"comment_info":"","_links":{"self":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/solutions\/2642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/solutions"}],"about":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/types\/solutions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/media\/4401"}],"wp:attachment":[{"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/media?parent=2642"}],"wp:term":[{"taxonomy":"referenzen-tag","embeddable":true,"href":"https:\/\/www.soltic.ch\/en\/wp-json\/wp\/v2\/referenzen-tag?post=2642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}